By: Johannes Fiegenbaum on 11/26/26, 11:33 AM
A text prompt to an AI model uses about a quarter of a millilitre of water in the data centre itself, roughly five drops. Add the water evaporated at the power plant that supplies the electricity and it is half a millilitre to almost two, depending on the grid. Both numbers are small. They become large through volume and through location: according to an NDR and Süddeutsche Zeitung analysis, about a quarter of the data centres planned in Germany sit in regions with existing water stress. Below: where the numbers come from, why press figures differ by a factor of 100, and a calculator for your own AI use.
As of November 2026.
| Source | Per text prompt | What is counted |
|---|---|---|
| Google, measured in its own operations (August 2025) | 0.24 Wh electricity, 0.26 ml water, 0.03 g CO₂e | Median Gemini text prompt, water in the data centre only |
| OpenAI, stated by its CEO (June 2025) | 0.34 Wh electricity, about 0.32 ml water | Average ChatGPT query, method not published |
| UC Riverside, Li et al. (2023, ACM 2025) | 500 ml for 10 to 50 responses, so 10 to 50 ml per response | GPT-3 in US data centres, cooling water plus water for power generation |
The range from 0.26 to 50 millilitres is not a contradiction but three different questions. Google measures a current, efficient model and counts only the water on site. The Riverside study works through an older, larger model and adds the water of the power plants, in a country where coal and gas still evaporate a lot of cooling water. Quoting either figure without saying which one sells a headline.
Set the sliders to your usage and location. The default is an average German data centre from the national register, running a current model.
Reference values: wind and solar power close to 0, German mix estimated at 0.5 to 1 (own calculation with NREL factors and the 2024 generation mix), Meta group value 2023 in the US 3.6.
| Electricity per year | 0 kWh |
| Cooling water in the data centre per year | 0 litres |
| Water for power generation per year | 0 litres |
| Total per year | 0 litres (0 US gallons) |
| Total per day | 0 litres |
| Total per prompt | 0 ml |
At 1,000 prompts a day, a mid-sized company using AI in daily work, that adds up to about 150 kWh and just over 70 litres of cooling water a year, plus 75 to 150 litres at the power plant. That is one bathtub. Images cost far more: Luccioni et al. measured 2.9 Wh per image, about 60 times a text answer from the models they tested. Falling AI token prices keep pushing the number of prompts up. How to bring the electricity of such prompts into your greenhouse gas inventory when the provider publishes no figures is covered in the article on the AI carbon footprint.
A data centre uses water in two ways, and the second is usually the larger one.
Directly, for cooling. Many large data centres cool by evaporation: water is sprayed, evaporates and carries the heat away. That saves electricity, but the water is gone. Closed loops and dry cooling get by with almost no water. The metric is WUE (Water Usage Effectiveness), litres per kilowatt hour of IT electricity, and in Germany operators have to report it to the federal data centre register. From the plausible entries there, Öko-Institut, commissioned by Greenpeace, calculated an average of 0.67 litres per kilowatt hour of IT electricity (short study, November 2026, in German).
Indirectly, at the power plant. Coal, gas and nuclear plants evaporate cooling water, hydropower evaporates it from reservoirs. Wind and solar need practically none in operation. Meta's 2024 sustainability report implies 3.62 litres per kilowatt hour of purchased electricity for 2023 (55,475 megalitres on 15.3 TWh), about 18 times its direct consumption. There is no official factor for the German electricity mix. Running the consumption factors of the US National Renewable Energy Laboratory (NREL) (coal and biomass about 2 litres, gas under 1 litre, wind and solar close to zero per kilowatt hour) against the German generation mix of 2024 gives roughly 0.5 to 1 litre per kilowatt hour. That is an estimate, not a measurement, and it falls with every percent of wind and solar on the grid.
The calculation for one prompt then looks like this: 0.3 Wh in the server times 0.67 litres per kilowatt hour of IT electricity is 0.2 ml direct, the same order of magnitude as Google's measured value. For the power plant, what counts is all the electricity at the grid connection: times a power usage effectiveness (PUE) of 1.37 (mean of the plausible register entries) for cooling and building services, that is 0.41 Wh. Times 3.6 litres per kilowatt hour gives another 1.5 ml at the power plant, on a fossil-heavy grid. On a grid with a lot of wind, this second item shrinks to a fraction.
| Item | Water | Source, year |
|---|---|---|
| One text prompt, data centre only | 0.26 to 0.32 ml | Google 2025, OpenAI 2025 |
| One text prompt, including power generation in the US | 10 to 50 ml | Li et al. 2023, GPT-3 |
| AI use of a company with 1,000 prompts a day, direct plus power plant | about 0.4 to 0.6 litres a day, 150 to 220 litres (40 to 60 US gallons) a year | Own calculation with the calculator defaults above (PUE 1.37, 0.67 l/kWh IT electricity direct, 0.5 to 1 l/kWh power plant) |
| Training GPT-3, cooling water only | about 700,000 litres | Li et al. 2023 |
| A new data centre with 100 MW IT capacity in Germany | 200 to 930 million litres a year, depending on cooling technology | Öko-Institut for Greenpeace, November 2026 |
| All data centres in Germany 2025 | about 13 billion litres direct (19 billion kWh IT electricity times 0.67 l/kWh) | Öko-Institut for Greenpeace, November 2026 |
| All data centres in Germany 2030 | up to 27 billion litres direct, if electricity demand rises to 55 billion kWh | Öko-Institut for Greenpeace, November 2026 |
| Data centres powering AI worldwide 2030, incl. power generation | water footprint equal to the basic domestic needs of 1.3 billion people in Sub-Saharan Africa | UN University, June 2026 |
The 13 billion litres for Germany sound enormous, but they are less than 0.1 percent of annual water abstraction in Germany, which the German Environment Agency (Umweltbundesamt) puts at 17.9 billion cubic metres for 2022. The problem is where it falls: a data centre draws its water at one point, from one aquifer, all year round, and most on hot days, when everyone else needs it too. Which tools show water stress at a given site is covered in the article on water risk assessment tools.
How reliable the register values are is an open question. According to the study, of about 1,200 data centres required to report for 2025, 484 reported, 319 published their data, and only 139 water entries were plausible. If you argue for a site with an operator's register value, check it against electricity consumption and connected load before you use it. What operators themselves have to disclose on energy and water is set out in the article on AI data centre energy and water.
Hardly. A text prompt to a current model uses 0.24 to 0.34 watt hours, a search about 0.3 watt hours according to Google's last published figure from 2009. Water follows electricity. The difference comes from long answers, images and video.
For GPT-3, researchers at UC Riverside estimated about 700,000 litres of cooling water evaporated directly in US data centres. Providers do not publish figures for newer models. According to the UN report of June 2026, 80 to 90 percent of AI's energy demand comes from everyday use anyway, not from training.
Almost. Closed loops and direct liquid cooling of chips use hardly any water in operation and can be combined with waste heat recovery. The price is more electricity for heat rejection, especially on hot days, but less than operators often claim: in the 139 plausible register entries, Öko-Institut found no relationship between energy efficiency (PUE) and water use (WUE). That is why location decides: where water is scarce and wind power plentiful, the closed loop wins, where it is the other way round, evaporation does.
No. Neither ESRS E3 nor the Voluntary Standard (VS) for SMEs, known as VSME, asks for the water behind purchased computing. The reporting obligation sits with the data centre operator, which in Germany reports WUE and energy data to the data centre register. It becomes relevant for you if a site with its own data centre or server space lies in a water-stressed region. Then the water belongs in the materiality assessment, not the AI use.
Sources
Altman, S. (2025, June 10). The gentle singularity [Blog post by the OpenAI CEO].
Elsworth, C., Huang, K., Patterson, D., Schneider, I., Sedivy, R., Goodman, S., Townsend, B., Ranganathan, P., Dean, J., Vahdat, A., Gomes, B., & Manyika, J. (2025). Measuring the environmental impact of delivering AI at Google scale (arXiv:2508.15734). Google.
Fraunhofer ISE. (n.d.). Energy-Charts: Electricity generation 2024.
Google. (2009, January 11). Powering a Google search [Blog post].
Gröger, J., & Behrens, F. (2026, November 2). Wasserverbrauch von Rechenzentren in Deutschland: Auswertung statistischer Daten und Verbrauchsprognosen [Short study by Öko-Institut Consult gGmbH for Greenpeace e. V., in German]. Greenpeace.
Li, P., Yang, J., Islam, M. A., & Ren, S. (2025). Making AI less "thirsty": Uncovering and addressing the secret water footprint of AI models. Communications of the ACM. Preprint 2023, arXiv:2304.03271.
Luccioni, A. S., Jernite, Y., & Strubell, E. (2024). Power hungry processing: Watts driving the cost of AI deployment? Proceedings of ACM FAccT 2024.
Macknick, J., Newmark, R., Heath, G., & Hallett, K. C. (2012). Operational water consumption and withdrawal factors for electricity generating technologies. Environmental Research Letters, 7(4), 045802.
Meta. (2024). 2024 sustainability report [Data index, 2023 values].
NDR & Süddeutsche Zeitung. (2026, August 28). [Investigation into planned data centres].
Umweltbundesamt. (n.d.). Wasserressourcen und ihre Nutzung [Water resources and their use, abstraction data 2022].
United Nations University, Institute for Water, Environment and Health. (2026, June 3). Environmental cost of AI's energy use: Carbon, water and land footprints.
ESG and sustainability consultant based in Hamburg, specialised in VSME reporting, carbon accounting and climate risk analysis. Works with mid-sized companies, investors and financial institutions, and developed the VSME reporting software VSEasy together with clients.
More aboutFixed pricesAn AI data centre moves three numbers in a sustainability report: electricity, water and Scope 2. Published projections for 2030 differ widely, and the reason has more to do with ...
Read more →